Terms and conditions

Terms and conditions.

GJH Tree Services

The Contractor - the person or business undertaking the works. The Client - the person or business instructing the works, who, in doing so and by accepting the quotation, agrees to the following terms and conditions.

1

Notice of the right to cancel - the client has 14 days from the date of acceptance to cancel the contract, either verbally or in writing. If work has already started before the 14 days have passed, this right will have expired.

2

This quotation or estimate is valid for 90 days and, unless stated otherwise, takes into account any value, monetary or otherwise, that the arisings may have.

3

Unless specified otherwise, all works will be carried out in accordance with the current British Standard, BS 3998 ‘Tree work - Recommendations’, where possible. Dimensions specified are approximate and, wherever possible, cuts will be made to the nearest appropriate pruning point.

4

In the event of a variation to the quotation as a result of:

  • amendments to the works required before arriving on site,
  • changes in site or ground conditions since the original visit, or
  • additional works requested or required whilst on site,

the quotation will be revised accordingly, either electronically in advance, hand-written, or agreed in person on the day of work, with amendments signed or agreed verbally by both the contractor and the client.

5

All arisings (including twigs, branches, woodchip, logs, trunks and foliage) will be removed from site and become the property of the contractor, unless specifically stated otherwise in the quotation.

6

Following written or verbal instructions from the client, the contractor will check with the Local Planning Authority (LPA) whether the tree(s) are subject to a Tree Preservation Order (TPO) and whether they are located within a Conservation Area.

7

The contractor will also consider whether a Felling Licence is required from the Forestry Commission (FC) or whether any other permissions or consultations are required, e.g. from Natural England or the Environment Agency.

8

Please note that if the contractor makes the necessary LPA application or notification, an administrative charge of £90 will apply. Similarly, a charge may apply for obtaining a Forestry Commission felling licence.

9

Planning is carried out on the proviso that GJH Tree Services will be the contractor that carries out the works, in accordance with the quotation provided. Where works are proposed to third-party trees, such as a neighbour’s trees, the contractor will require written confirmation from the tree owner that the works are agreed and, where necessary, that access is permitted. If the works apply only to overhanging branches that can be pruned from within the client’s property, permission is not required, but the neighbour should be informed where practicable (please also see clause 6 above, as this may also apply).

10

The contractor holds £5 million public liability insurance, and a copy of the certificate is available on request. The contractor will operate in accordance with good industry practice and its health and safety policy and procedures, and will undertake site-specific risk assessments (the outcomes of which may place constraints on the site whilst works are in progress, e.g. the client may not be able to access their shed without prior agreement from the ground staff). The site will be left generally clean, tidy and safe but, because of the nature of the works, including the production of wood dust, chainsaw chippings, woodchip, twigs, leaves and needles, and the movement of site personnel, it will not be exactly as it was before the works began.

11

If the works run over several days, the site will be left safe and in the condition agreed with the client beforehand. The contractor will undertake the works as scheduled but is aware of, and may be constrained by, ecological and wildlife legislation, including:

  • Wildlife and Countryside Act
  • Countryside and Rights of Way Act
  • Conservation of Habitats and Species Regulations (as amended).

This legislation requires the contractor to assess the impact of the works, which may result in the works being delayed if nesting birds, roosting bats or similar are present.

12

Should the works not be fully completed due to obstacles beyond our control, any deduction from the final cost will be at the discretion of the contractor.